ProJet b.v. received an order for 3 Power Cleaners for the PM1 at a recycled paper mill for Packaging paper in Central France. PM1 manufactures Medium & Liner on a 4.6 meter wide machine at 740m/min. The Power Cleaners will be installed on PM1 on the 1st Unirun and 2nd Top & Bottom Dryer section.
The order was received in June ’25 and will be delivered Q4 ’25. The value of the order will not be disclosed.
The Power Cleaners will bring the following benefits:
– Higher drying capacity: steam consumption reduced by 10%
– Eliminate holes and defects: reduce reject / broke
– Longer life of the Dryer Fabrics
– Elimination of sheet breaks
– Elimination of down time for manual cleaning
– Elimination of cleaning chemicals
– Better CD profile
Photo: Projet b.v
RELATED NEWS
Best wishes for 2026 from the PaperFIRST Team
January 1, 2026
LATAMPAPER Buenos Aires – A must attend event in 2026
December 18, 2025
Elof Hansson appoints Lennart Eberleh as new CEO
December 17, 2025
Toscotec starts-up PM5 tissue line for Saudi Paper Group in Saudi Arabia
December 17, 2025
Rottneros President and CEO Lennart Eberleh has resigned
December 12, 2025
Andritz starts up sludge drying plant at Eldorado Brasil Celulose
December 12, 2025
GardaMatt Ice: Lecta’s new coated paper for premium publishing
December 12, 2025
SCA on CDP’s sustainability A-List 2025
December 10, 2025
Adestor Collect & Recycle teams up with SOPREMA to promote recycling
December 9, 2025
Billerud invests in the next level of fluting performance at Gruvön
December 9, 2025